2096 · former Warringah
Freshwater.
Steep streets to the ocean. Warringah LEP 2011 is still the principal LEP.
Freshwater sites often combine slope, verge trees and a charged drainage line. On-site detention is part of a stormwater concept for the DA. Driveway geometry and kerb levels come from survey. Manly Engineering is our local door for Freshwater: manlyengineering.com.au
Typical work: Alterations and additions, new dwellings on sloping lots.
